Great Lakes Cheese

Expanding Space with Innovation and Problem-Solving

The Great Lakes Cheese facility expansion in Plymouth is a two-story addition designed to integrate seamlessly with the existing building while introducing updated exterior design elements. The project required close coordination and precise execution to ensure the new work matched the original structure, while elevating the overall look and performance of the facility.

MUZA’s Scope

MUZA manufactured and installed 6,412 square feet of exterior product on this project, completed over roughly two months, where integrated materials deliver a bold, cohesive palette and a clean, modern MUZA’s Colors of Innovation finish.

The exterior systems and finishes include:

  • MUZA MZ Batten Plank
    • Konig Blue
  • MUZA MZ-2000 Rainscreen System
    • Slate Gray
  • MUZA MZ Vented Soffit Panels
    • Slate Gray
  • MUZA Flashings and Trims
    • Konig Blue
    • Slate Gray

The MUZA Advantage

This project presented a unique canopy challenge. To address water infiltration while maintaining the original architectural intent, MUZA developed a custom water-shed system. A practical, long-lasting solution that protects the products below and improves overall performance.

The Result

From standout products to on-site problem-solving, this expansion highlights MUZA’s ability to deliver quality, precision, and innovative thinking. The updated Great Lakes Cheese facility now stands as a seamless, modern extension of the original building. Built with solutions designed to last.

LOCATION

Plymouth WI

ARCHITECT

Excel Engineering

General Contractor

Miron Construction